AVAILABLE NOW
Free
€0
Core calculators and preliminary pWPS drafts are available free during beta. No account or payment is required. Engineering review remains mandatory.
Use free calculatorsENGINEERING CONTROL
WeldCalcPro produces preliminary planning outputs from the inputs you provide. Every pWPS draft must be checked against the governing code, qualified procedure record, project specification, material data and actual production conditions before use.
Traceable inputs · Transparent assumptions · Qualified professional approval
EARLY ACCESS PLANS
Use the core calculators at no cost. Paid features will begin only after the beta has proved useful to working professionals.
AVAILABLE NOW
Core calculators and preliminary pWPS drafts are available free during beta. No account or payment is required. Engineering review remains mandatory.
Use free calculatorsPLAN IN DEVELOPMENT
Preliminary pWPS drafts are available free during beta. Saved projects, history and PDF export are planned for a future paid plan.
Join early accessPLANNED
Team workspace
Review and approval workflow
Priority support
No payment is collected during beta. Planned prices may change after user testing.
Estimate weld-metal mass, arc time, total production time, consumables and direct welding cost using transparent planning assumptions.
Process-, position- and consumable-adjusted planning estimate
Direct cost estimate in EUR
Preliminary classification guidance
Typical starting geometry only
IIW carbon-equivalent assessment
Typical starting ranges for planning
Likely causes and corrective checks
Common schematic joint concepts
Schematics are not fabrication drawings. Confirm dimensions, access, loading, backing and qualified WPS/WPQR.
Pre-weld setup verification
Planning estimate only. The time result excludes preparation, cutting, beveling, fit-up, alignment, tack welding, handling, preheat, interpass waiting, cleaning, inspection, repair and post-weld treatment. Verify actual procedure qualification, joint volume, deposition data, duty cycle, consumable efficiency, local prices, labor rules and project requirements before quotation or production use.